A Case Study on: Stadium Sultan Zainal Abidin in Gong Badak Terengganu Sports Complex

PROJECT PROFILE

Project Name: Terengganu Sports Complex
Location: Kuala Terengganu, Terengganu State, Malaysia
Costs: About 300Mil

Status: Complete
Expected Completion
-Main stadium: September 2007;
-indoor stadium: January 2008
Officially Opened: May 10, 2008

Site Area: 74 hectares, Gross Floor Area
Main stadium: 100,000 m²;
Indoor Stadium: 3,119 m²

Building Height: Main stadium: 67 m (east stand), 36.3 m (west stand); Indoor stadium: 42 m
Storeys: Main stadium: 9 (east stand);Indoor stadium: 4-4.5
Seating Capacity: Main stadium: 60,000; Indoor stadium: 5,000

Stakeholder: Client/Owner
  • Terengganu State Government
  • Architecture Firm
  • Senibahri Arkitek
  • Principal Architect
  • Ar. Raja Kamarul Bahrin Shah
  • Project Architect
  • Badrul Hisham
  • Main Contractor
  • Main stadium: Bina Structur-Genggam Mercu-Emarcon JV; Indoor stadium: Ahmad Zaki Sdn Bhd
  • Mechanical & Electrical Engineers
  • Main stadium: Public Works Department, Terengganu (Mechanical & Electrical Division); Indoor stadium: Samudra Consult
  • Civil & Structural Engineers
  • Main stadium: AZM Engineers- MA Consult-Protech Consultant consortium Indoor stadium: MECIP (M) Sdn Bhd
  • Images/Photos
  • Senibahri Arkitek
P/S:
Bagi sesiapa yang ada maklumat tambahan sila berikan comment anda.

Stadium Tuanku Mizan Zainal Abidin


Bernama reports that 60 percent of the roof at the stadium that was built at a cost of RM270 million and opened on May 10 last year, collapsed, including that above the royal box at the grand stand. According to a worker, Mohd Zaidi Ahmad who was one of two workers who were fixing lights at the stadium about 300m from where the incident happened, said he rushed to the scene to see if there were any casualties.

However, although there was no immediate news of anyone being injured, a team from the fire and rescue department and the Civil Defence Unit were at the scene to check if there were any victims trapped under the rubble. Another witness, Asmadi Hashim who lives about 400m from the stadium, said he heard a loud explosion and had initially thought it came from an aircraft engine as the Sultan Mahmud Airport was situated close by.Other witnesses claimed that the roof above the VIP area of the grand stand, including the royal box, was the first to collapse. A visit by Bernama to the site saw workers clearing the debris. When opened last year, just ahead of the SUKMA that was hosted by Terengganu, the Sultan Mizan Zainal Abidin Stadium stood as a landmark for sports development in the state.

It was also the venue for a number of other major sporting events, Super League and Premier League football matches. A sports meet involving staff of local universities due to start tomorrow at the venue has been called off following the roof collapse.The multi-use stadium in Kuala Terengganu is the biggest stadium in the East Coast and was built to host the 2008 Sukma Games.

Our Research
Was the completed job inspected and certified by the relevant authorities through the proper procedure after conducting investigations and tests or was is it due to an unexpected reason?